24 May 2010 (Monday)

It was pretty slow today in the office. My Supervisor for Project Department (Mrs.Nurziah) is on leave. She left us some task to do during her absent. First, I helped the other trainee to mark the location on the grid line as stated on the checklist form.This is a sample of the inspection form given to the site supervisor during the concreting or after they dissemble the form-work. The project is Shopping Complex Darvel Bay, Lahad Datu.

The location that will be check is:
1) 1st Floor Beam & Slab at G/L 5-6/ J-L
2) 2nd Floor RC feature wall at G/L 17-17c/ C-D
3) Parapet wall at 17c / G1 - G3



Both the form above is the continue form after previous page. It is the checklist for concreting. any defects, problems will be reported here, and any step to overcome these problem will be noted here.


Here is the Grid Line for 1st Floor Slab. The colored area is the area where checking for the slab done. G/L 5-6/ J-L.