The purchaser of unit 5 and unit 7 came with us to inspect together. There's a lot of defects founded, but Pan Sheng doesn't want to take responsibility, since the liberty period has already ended. Most of the defects are caused by bad workmanship.
Hence SUDC agreed to do all the rectification work. We appointed our contractor to do the work. Here, in the picture, we can see Mr. Lim were discussing with the purchaser.
SUDC foreman are inspecting for any problem causing the leak at the car-posh ceiling.
-Later on we went to SabaConcrete S/B. This time we're gonna do the test cube testing on our own. The cube we used for testing was not the concrete for any of SUDC's project. But it was especially made for our testing. There were a total of 3 grade 3o concrete cubes. All of them were 7 days old. We then do the calculation to determine the strength of the concrete. It was quite challenging because all the explanation were in Malay.
-Observe how the concrete were mix from a silo, to the lorry mixer for transportation to the construction site.
No comments:
Post a Comment